Load-shedding awareness
Load-shedding is part of the trip. Plan for it.
See the ZESA slots for your groups over the next 48 hours, and which favourite stops they may affect. A scheduled slot is a warning, not a certainty: some sites have backup power, so check the operator’s latest status and keep a backup.
Status, schedule, uncertainty
What the app can tell you about a stop
A ZESA slot says what is scheduled. The operator’s status says what it last reported. They are shown separately.
What the operator reported
Each charger’s status as its operator last reported it (available, in use, out of order or unknown) and when it was updated.
A scheduled outage
A ZESA slot that may affect a favourite stop, from the published group schedules.
Neither, or out of date
An unknown status or an old update is a reason to check again before you leave and to keep a backup stop.
One screen
What the load-shedding screen shows
For example: Today 21:00–23:59, Stage 1, Bulawayo Group 2; Tomorrow 12:00–14:00, Stage 2, Harare North Group 3 (demo data).
Your ZESA groups
A card for each ZESA group you follow, with its next scheduled slot.
Now, in your areas
“Shedding now in your area until 14:30”, or “No load-shedding in your areas right now”.
Your areas, chosen once
Pick your ZESA groups, in Harare, Bulawayo and elsewhere. Your favourite chargers’ groups are added for you, and labelled.
The next 48 hours
Every scheduled slot across your areas, with day, time and stage, so you can choose when to leave and where to stop.
Favourite stops at risk
Which favourites a slot may affect, and when. Tap one to open the charger and check its latest status.
A chip on the home screen
When one of your ZESA groups is in a slot, a status chip on the home screen takes you straight to the details.
Alerts
Told when a charger drops during a slot
Scheduled outage may affect this stop: check the operator’s latest status and keep a backup.
An alert is a schedule match: when a charger goes offline inside a load-shedding slot (or within five minutes of one), the platform links the outage to the slot and alerts drivers who are charging there or have it as a favourite, so you know why it went dark and roughly when it should be back.
A charger that drops outside any slot is not linked to ZESA: check its operator’s status, or contact the operator on the charger.
- Outages matched to the load-shedding schedule, with alerts to affected drivers
A favourite charger flagged by a scheduled ZESA slot.
- What you see: your favourite charger’s ZESA area, its next slots and the favourite it affects
- Why it matters: you plan around a slot before you drive
Not a ZESA slot
Operator maintenance is shown separately
When an operator plans work on a connector, the app shows it as the operator’s notice, with its own times.
The orange note on this start screen is planned maintenance by the operator (one connector, tomorrow 08:00–11:00), not a ZESA slot. The other connectors and their prices are still listed.
- Each connector with its status and price before you start
Choose a connector: its price per kWh, then the estimate and the amount reserved, before you confirm.
- What you see: the connectors with their power and price, and the estimate and amount reserved above the start button
- Why it matters: you see what will be held before you confirm
At home
Charge your car around the slots at home
A public station may have backup power: check its reported status before leaving. At home, set a separate charging window.
Off-peak and window schedules
Charge tonight, off-peak, by departure time, to a target %, or in a window you choose.
Points for off-peak charging
Charging between 22:00 and 06:00 tariff time earns rewards points you can turn into charging credit, on qualifying sessions.
Reimbursed home charging
If your employer pays home charging back, only measured energy counts, so a session interrupted by an outage is paid for what it delivered.
Where the schedules come from
ZESA schedules, kept current for you
Schedule source
ZESA group schedules, managed by the operator of the service.
Areas
ZESA groups in Harare, Bulawayo and the other towns on the schedule.
Updates
Group schedules kept current by the operator of the service.
Load-shedding questions
Does load-shedding always switch a charger off?
No. Some sites have backup power or are on circuits that are not shed. The schedule tells you which stops are at risk; the operator’s latest status tells you what it last reported; the alerts tell you when one actually drops during a slot.
Can I start a charge during load-shedding?
If the charger has power and a connection, yes. Starting needs the charger, its operator, Getz Hub and the platform to be reachable, because every start is authorised in real time.
Drive with the schedule, not against it
DriEv is coming soon to the App Store and Google Play. Join and Getz will tell you when it is ready for your phone.